午夜不卡AV免费,午夜福利理论片在线观看,免费A级毛片在线播放不收费 ,无码AV天堂亚洲内射夫妻

Thanks to modified techniques, bridge over Huayang River got its mega bored pile foundation completed
ACEG Road and Bridge Engineering Company Limited  |  Updated: 2021-03-04  |  Views: 12953
As the Chinese proverb goes, the spring comes earlier for those who are diligent. At 16:49 on February 26th, 2021, the concrete casting work for the last bored pile of the main bridge over Huayang River in Anhui province, China, has finished as scheduled, which marked the time came for ACEG Road and Bridge Engineering Company Limited, the contractor of the bridge project, to get ready for the construction phase of the superstructures of the bridge in an all-round way.
 
 
According to the design, bored cast-in-place piles with a diameter of 2.5 meters were adopted for the underwater foundation of the main piers of Huayang River Bridge; each pier has three piles in two rows and the designed depth of the piles range from 63 meters to 64.5 meters and the boreholes were drilled in method of reversed circulation pumping suction and the vertical piping casting method was used to pour the concrete into boreholes.
 
 
The company’s 2.5m diameter borehole and concrete filling techniques have successfully overcome the problems for the project under the complex geological conditions, as large diameter pile drilled with a small drill, shaft wall protection by drilling mud, drilling in an iron grit layer and nuisanceless disposal of the drilling mud, which have the advantages of fast speed, high efficiency and high qualities.
 
 
The average distance between the main bridge under construction over Huayang River and the old bridge in operation is less than 0.5m and the pile foundation is located inside the riverbed in poor geological conditions of complex stratums and the construction spaces were limited. Since the commencement of the project in 2019, under the strong supports of the administrative departments at all levels and the technical guidances of several well-known experts of the company and the industry, the new Huayang River Bridge has undergone several design adjustments and optimization, that have resulted in the improvement of the navigable level of Huayang River, better operation safety of the old bridge and less construction investment costs.
 
The satisfactory completion of the concrete pouring of the main bridge piles provides a time guarantee for the completion of the bearing platform construction before the flood season in 2021 and lays a solid foundation for the completion and delivery of the bridge in the second half of the year. It also provides technical references and demonstration for similar projects in the future.
 
狠狠躁夜夜躁人人爽超碰97香蕉 | 人人妻人人澡人人爽人人精品| 国内精品久久毛片一区二区| 欧美在线 | 亚洲| 性色av蜜桃av人妻无码| 欧美另类videossexo| 狠狠色噜噜狠狠亚洲AV| 工口里番h本之侵犯全彩在线| 久久久久亚洲av片无码v| 国产精品毛片一区二区| 久久久久久久波多野结衣高潮| 性一交—乱一性一A片在线播放| 尤物视频在线观看| 无码AV人妻一区二区三区四区| 野外做受又硬又粗又大视频√| 未满小14洗澡无码视频网站| 日日摸夜夜添无码无码AV| 国产农村熟妇出轨videos| free性开放小少妇| 天堂资源中文最新版在线一区| 香蕉久久久久久AV成人| 久久午夜夜伦鲁鲁片免费无码影视| 亚洲色欲啪啪久久www综合网| 亚洲小说春色综合另类| 久久99久久精品免观看吃奶| 口工漫画18禁无遮挡▓3D| 性大毛片视频| 黑人大荫道bbwbbb高潮潮喷| 成人av视频免费观看| ぱらだいす天堂中文网.WWW| 无码人妻精品一区二区三区9厂| 成熟闷骚女邻居引诱2| 亚洲日本va中文字幕久久道具| 野花视频在线观看免费| 精品少妇人妻av无码专区偷人 | 嗯灬啊灬把腿张开灬a片视频| 成人在色线视频在线观看免费社区| 娇小性xxxx摘花hd| 久久久久亚洲AV成人网人人软件 | 欧美vpswindows另类| 欧美激情一区二区三区|