午夜不卡AV免费,午夜福利理论片在线观看,免费A级毛片在线播放不收费 ,无码AV天堂亚洲内射夫妻

Thanks to modified techniques, bridge over Huayang River got its mega bored pile foundation completed
ACEG Road and Bridge Engineering Company Limited  |  Updated: 2021-03-04  |  Views: 12953
As the Chinese proverb goes, the spring comes earlier for those who are diligent. At 16:49 on February 26th, 2021, the concrete casting work for the last bored pile of the main bridge over Huayang River in Anhui province, China, has finished as scheduled, which marked the time came for ACEG Road and Bridge Engineering Company Limited, the contractor of the bridge project, to get ready for the construction phase of the superstructures of the bridge in an all-round way.
 
 
According to the design, bored cast-in-place piles with a diameter of 2.5 meters were adopted for the underwater foundation of the main piers of Huayang River Bridge; each pier has three piles in two rows and the designed depth of the piles range from 63 meters to 64.5 meters and the boreholes were drilled in method of reversed circulation pumping suction and the vertical piping casting method was used to pour the concrete into boreholes.
 
 
The company’s 2.5m diameter borehole and concrete filling techniques have successfully overcome the problems for the project under the complex geological conditions, as large diameter pile drilled with a small drill, shaft wall protection by drilling mud, drilling in an iron grit layer and nuisanceless disposal of the drilling mud, which have the advantages of fast speed, high efficiency and high qualities.
 
 
The average distance between the main bridge under construction over Huayang River and the old bridge in operation is less than 0.5m and the pile foundation is located inside the riverbed in poor geological conditions of complex stratums and the construction spaces were limited. Since the commencement of the project in 2019, under the strong supports of the administrative departments at all levels and the technical guidances of several well-known experts of the company and the industry, the new Huayang River Bridge has undergone several design adjustments and optimization, that have resulted in the improvement of the navigable level of Huayang River, better operation safety of the old bridge and less construction investment costs.
 
The satisfactory completion of the concrete pouring of the main bridge piles provides a time guarantee for the completion of the bearing platform construction before the flood season in 2021 and lays a solid foundation for the completion and delivery of the bridge in the second half of the year. It also provides technical references and demonstration for similar projects in the future.
 
国产又爽又黄又爽又刺激| 精品人妻无码区在线视频| 欧美丰满熟妇XXXX性大屁股 | free性玩弄少妇hd| 久久成人国产精品麻豆| 精品少妇一区二区三区视频| 在线视频免费观看| 国产av精品一区二区三| 亚洲娇小与黑人巨大交| gogo大胆欧美人体艺杧图片 | 绿帽娇妻肚子被灌满精怀孕| 大内密探零零性| 制服 丝袜 亚洲 中文 综合| 性大毛片视频| 国产精品沙发午睡系列99| 欧美+日韩+国产| 免费AV一区二区三区| 手机在线看永久AV片免费| 西西人体大胆啪啪私拍色约约| 女朋友水太多进去就软了| 久久久国产打桩机| 国产精品 精品国内自产拍| 我的少妇邻居全文免费| 舌头伸进去添的我爽高潮| 日产一区日产2区| 国产在线精品国自产拍影院同性| 日本不卡三区| 公公的淫之手| 为妺妺检查身体h| 国产精品毛片大码女人| 久久久久久精品成人鲁丝电影| 奇米777狠狠色噜噜狠狠狠 | 97久人人做人人妻人人玩精品| 少妇人妻互换不带套| 小雪第一次交换又粗又大老杨| 啊灬啊灬啊灬免费毛片| 全免费A级毛片免费看网站| 欧美精品色婷婷五月综合| 强奷乱码中文字幕熟女导航| 国产午夜精品一区理论片飘花| 国产精品无码久久久久不卡|